Wirenet Image Band
wirenet.org mobile image band

Wire Journal News

NKT commissions power cable system for U.K.’s Hornsea 2 offshore wind farm

6/2/2022 -

NKT reports that it has completed connecting the power cable system that links the Hornsea 2 offshore wind farm to shore in what will be, when fully operational later this year, the world’s largest such energy producer.

A press release said that the Hornsea 2 system, which has capacity of 1.3 GW, required 196 km of 220 kV HVAC. Located 89 km off the English east coast, the wind farm has 165 8 MW turbines. The site was described as “a key to the transition to renewable energy in the U.K.,” designed to provide power to more than 1.3 million households when fully operational. The Hornsea claim to the world’s largest operating offshore wind
farm, will see it take the title from the current holder, Hornsea 1.

The power cables for Hornsea 2 were manufactured at the NKT factory in Karlskrona, Sweden, which runs on 100% green electricity minimizing the carbon footprint of the cable system. As part of the environmental focus of the operation, the installation of the submarine power cable systems was completed by NKT Victoria. The company will install the remaining turbines and continue testing, commissioning, and energizing Hornsea 2.

NKT has extensive experience in connecting offshore wind parks to the U.K. mainland including commissioned projects such as Hornsea 1, Moray East and the Walney Extension. Currently, NKT is involved in ongoing offshore wind projects such as the Dogger Bank offshore wind farm, which will be the first offshore wind farm in the U.K. to be connected to shore with a HVDC power cable link.

Read 1266 times Last modified on June 2, 2022

Contact us

The Wire Association Int.

71 Bradley Road, Suite 9

Madison, CT 06443-2662

P: (203) 453-2777